Designing highways for adoption
Find out how to adopt a road in Islington so it becomes maintained at public expense
- commuted sum guidance note (PDF 460KB)
London permit scheme
See the order bringing the London permit scheme in Islington (PDF 750KB)
Flooding
We jointly commissioned a flood risk assessment with other north London boroughs.
Read the North London strategic flood risk assessment (PDF 904KB)
Highways asset management plan
Setting out how the highway assets are valued, and the context of the road network within the local community.
Read the asset management plan (PDF 1MB)
Islington highways handbook
Information about how we inspect and maintain our highways.
Download the Islington highways handbook (PDF 3MB)
Dropped kerbs
If you want to lower a kerb (also known as vehicle crossover) you can find out how here.
- Guidance and information before you apply (PDF 210KB)
- Dropped kerb application form (DOC 180KB)
Islington transport strategy
We consulted on a new transport strategy for 2019 – 2041 in mid-late July 2019. Find out more about the consultation.
We will be publishing the Islington Transport Strategy 2020 – 2041 in early 2021.